Mitsubishi MS-07RV Manual de servicio Pagina 69

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 80
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 68
69
OPERATING PROCEDURE PHOTOS
3. Removing the heat exchanger and the compressor
(
1
)
Remove the rear panel.Remove the valve bed, and
open the rear panel to the rear to remove.
NOTE :
All panels are fixed by catches, and must be removed by
shifting up and down.
(
2
)
Remove the screws of the right side panel and remove
it.
(
3
)
Remove the screws of the rear guard and remove it.
(
4
)
Remove the screws of the separator support plate and
remove it.
(
5
)
Remove the screws of the motor support and remove
it.
(
6
)
Remove the screws of the valve bed.
The valve bed is fixed by the catches on the right and
left sides.
Lift it to remove.
(
7
)
Remove the electrical parts box.
Disconnect the connectors from the high pressure
switch, crank case heater, shell thermo, and fan motor
lead.
(
8
)
Remove the screws of the separator and remove it.
(
9
)
Remove the screws of the heat exchanger and remove
it.
Detach the welded point of pipe.
(
10
)
Remove the nuts of the compressor and remove it.
Detach the welded points of the compressor suction
pipe and discharge pipe.
Photo 4
Photo 5
Photo 6
Compressor
Ball valve
Charge plug
Heat exchanger
Accumulator
Screws
Screws
OB207t-3qxp 25/9/97 9:05 PM Page 69
Vista de pagina 68
1 2 ... 64 65 66 67 68 69 70 71 72 73 74 ... 79 80

Comentarios a estos manuales

Sin comentarios